Hi,
I have a 92 vmax with a spun crank. The sled also has a number of other issues, so I was thinking I would part it out. However, it recently occurred to me that it might be better to fix the crank so I can ride it this winter, and then part it out in the spring. My question is, what is a general costs for having a crank re phased and welded? Are there any other major costs associated with a pulling out a crank, such as gaskets and what not?
Thanks, John
I have a 92 vmax with a spun crank. The sled also has a number of other issues, so I was thinking I would part it out. However, it recently occurred to me that it might be better to fix the crank so I can ride it this winter, and then part it out in the spring. My question is, what is a general costs for having a crank re phased and welded? Are there any other major costs associated with a pulling out a crank, such as gaskets and what not?
Thanks, John